Dirt Treaders
https://www.dirttreaders.com/phpBB3/

Trail Closure at Calavera 6/1 to 6/10
https://www.dirttreaders.com/phpBB3/viewtopic.php?f=5&t=18225
Page 1 of 1

Author:  OldDogDan [ Sat May 29, 2021 5:46 pm ]
Post subject:  Trail Closure at Calavera 6/1 to 6/10

C’mon, who ya kidding? That’s a road, not a trail. Shouldn’t be a problem, unless you are wanting to legally connect the Lake trails down to the South 40.

Attachment:
695CC03D-320B-4360-9DFB-DC3DE55E179F.jpeg
695CC03D-320B-4360-9DFB-DC3DE55E179F.jpeg [ 2.51 MiB | Viewed 16196 times ]

Author:  pperrelle [ Sat Jun 05, 2021 4:03 pm ]
Post subject:  Re: Trail Closure at Calavera 6/1 to 6/10

They have some heavy equipment out there. Not sure what the end goal is.

Author:  Big Clyde [ Sat Jun 05, 2021 8:41 pm ]
Post subject:  Re: Trail Closure at Calavera 6/1 to 6/10

pperrelle wrote:
They have some heavy equipment out there. Not sure what the end goal is.



Probably building homes :mrgreen:




:cheers:

Author:  klurejr [ Tue Jun 29, 2021 1:33 pm ]
Post subject:  Re: Trail Closure at Calavera 6/1 to 6/10

Rode it on Sunday with my son. They put a ton of rock down at the spots where the creek crosses the road and further towards the school where water must come out of the hillside and flood the road.

Hopefully the end result is better drainage of the road when we have heavy rainfall instead of all the standing water turning it all soft.

Page 1 of 1 All times are UTC - 8 hours [ DST ]
Powered by phpBB® Forum Software © phpBB Group
http://www.phpbb.com/